Search scope:
排序: Display mode:
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
Frontiers of Environmental Science & Engineering 2018, Volume 12, Issue 5, doi: 10.1007/s11783-018-1084-1
A novel two sludge pre-A2NSBR system was developed.
Keywords: Denitrifying phosphorus removal C/N ratio Nitrate recycling Carbon source type Biological nutrient removal Pre-A2NSBR system
Hailin WANG
Frontiers in Energy 2019, Volume 13, Issue 3, Pages 571-578 doi: 10.1007/s11708-019-0640-0
Keywords: China’s National Determined Contribution emission reduction potential scenario analysis CO2
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 3, Pages 376-382 doi: 10.1007/s11709-010-0086-2
Keywords: tension system glass wall nonlinear analysis pre-tensioning second-order analysis
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
Frontiers of Mechanical Engineering 2015, Volume 10, Issue 4, Pages 367-372 doi: 10.1007/s11465-015-0367-5
For a repetitive command path, pre-compensating the contouring error by modifying the command pathTo obtain the pre-compensation value with better accuracy, this paper proposes the use of a back propagationFurthermore, by using the extracted function, the contouring error can be easily pre-compensated.
Keywords: contouring error pre-compensation motion control system back propagation (BP) neural network
P. V. Korake, A. G. Gaikwad
Frontiers of Chemical Science and Engineering 2011, Volume 5, Issue 2, Pages 215-226 doi: 10.1007/s11705-010-1012-9
Keywords: capturing CO2 lithium silicate lithium aluminate magnesium aluminate
Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 3, Pages 411-428 doi: 10.1007/s11709-023-0928-3
Keywords: pre-stressed concrete sleeper ultrahigh performance fiber-reinforced concrete pull-out test static
Study on new assessment system for safety health monitoring of Xihoumen and Jintang Bridges
Zheng Chun,Wu Chongnan,Zhang Xinyue,Shen Wang,Liang Zhu,Ma Qin
Strategic Study of CAE 2010, Volume 12, Issue 7, Pages 84-89
With the development of health monitoring system for the long span bridgeexperiences of practice engineering—Zhoushan Island Xihoumen and Jintang Bridges' health monitoring system, the authors designed a new assessment system, making comprehensive assessment of long span bridges,
Keywords: long span bridge structural assessment system structure pre-warning system
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 127-132 doi: 10.1007/s11709-010-0007-4
Keywords: grout pre-placed concrete two-stage concrete (TSC)
Ali Fadhil NASER, Zonglin WANG
Frontiers of Structural and Civil Engineering 2013, Volume 7, Issue 2, Pages 164-177 doi: 10.1007/s11709-013-0196-8
Keywords: structural performance steel plates external pre-stressing cracks grouting method static
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
Frontiers of Chemical Science and Engineering 2020, Volume 14, Issue 3, Pages 436-452 doi: 10.1007/s11705-019-1870-8
Keywords: carbon capture and storage (CCS) techno-economic comparison pre-combustion capture physical solvent low-temperature
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
Frontiers of Structural and Civil Engineering 2018, Volume 12, Issue 3, Pages 352-360 doi: 10.1007/s11709-017-0453-3
Concrete members historically have used either pre-stressed steel or steel bars.However, the flexure behavior of a hybrid system reinforced by the combination of pre-stressed steelEach slab had 37.41 mm2 prestressing wire with a failure stress of 1722.5 MPa.The theoretical slabs were either reinforced with pre-stressed steel or GFRP rebars, or a hybrid systemIt was found that the hybrid system produces better results.
Keywords: Partial pre-stressing composite structures GFRP bars
Manoj Kumar PANDA, Gopinath PILLAI, Vijay KUMAR
Frontiers in Energy 2013, Volume 7, Issue 3, Pages 307-316 doi: 10.1007/s11708-013-0269-3
Keywords: power system oscillations thyristor controlled series capacitor (TCSC) type-2 fuzzy logic system intervaltype-2 fuzzy logic controller (IT2FLC)
A new anti-jamming communication technical system:pre-encoded code hopping spread spectrum
Yao Fuqiang,Zhang Yi
Strategic Study of CAE 2011, Volume 13, Issue 10, Pages 69-75
A kind of pre-encoded code hopping spread spectrum (PCHSS) communicationtechnical system for anti-jamming communication is brought forward and researched after analyzing itsThe technical system and its basic performance have been proved in practice.
Keywords: anti-jamming communication direct-sequence spread spectrum pre-encoded code hopping spread spectrum
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
Frontiers of Engineering Management 2019, Volume 6, Issue 2, Pages 207-220 doi: 10.1007/s42524-019-0016-5
Keywords: steel structure pre-assembly BIM plane-line-point 3D measurement
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
Frontiers of Structural and Civil Engineering 2019, Volume 13, Issue 6, Pages 1393-1404 doi: 10.1007/s11709-019-0563-1
Keywords: pre-grouting stability analysis factor of safety discontinuity layout optimization
Title Author Date Type Operation
Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
Journal Article
Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
Journal Article
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
Journal Article
dioxide over porous solid adsorbents lithium silicate, lithium aluminate and magnesium aluminate at pre-combustion
P. V. Korake, A. G. Gaikwad
Journal Article
Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete
Journal Article
Study on new assessment system for safety health monitoring of Xihoumen and Jintang Bridges
Zheng Chun,Wu Chongnan,Zhang Xinyue,Shen Wang,Liang Zhu,Ma Qin
Journal Article
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
Journal Article
Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder
Ali Fadhil NASER, Zonglin WANG
Journal Article
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
Journal Article
Hybrid flexural components: Testing pre-stressed steel and GFRP bars together as reinforcement for flexural
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
Journal Article
An interval type-2 fuzzy logic controller for TCSC to improve the damping of power system oscillations
Manoj Kumar PANDA, Gopinath PILLAI, Vijay KUMAR
Journal Article
A new anti-jamming communication technical system:pre-encoded code hopping spread spectrum
Yao Fuqiang,Zhang Yi
Journal Article
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
Journal Article